Side or diagonal cutting pliers are used best for which of the following?

Cutting wire

Tightening electrical connectors

Stripping wire insulation

Shaping wire into a hook

Answers

Answer 1

For cutting wire, side or diagonal cutting pliers work best. These pliers have clean, minimally distorting jaws that are sharp and angled to cut through wire. In electrical work, they are frequently employed.

What are the purposes of diagonal side cutting pliers?

To use diagonal cutting pliers correctly: for tasks involving the removal of pins, nails, and other fasteners, as well as the cutting and skinning of wires.

When cutting steel wires, which component of the pliers is used?

The jaws are used to remove undesired nails and tiny needles from a surface as well as to bend, cut, and slice wires. Pliers can be used for a number of tasks depending on the length and unique layout of the jaws.

To know more about cutting pliers visit:-

https://brainly.com/question/17658936

#SPJ1


Related Questions

assume that a pitot tube is inserted into the test-section flow of the wind tunnel in problem 3.4. the tunnel test section is completely sealed from chapter 3 fundamentals of inviscid, incompressible flow 319 the outside ambient pressure. calculate the pressure measured by the pitot tube, assuming the static pressure at the tunnel inlet is atmospheric.

Answers

The Pitot tube measures air velocity directly by means of a pressure transducer which generates an electrical signal which is proportional to the difference between the pressure generated by the total pressure and the still air (static pressure).

Fluid flow velocity is measured using a pitot tube (pitot probe; /pito/ PEE-toh). It was developed in the early 18th century by a French engineer named Henri Pitot. and changed into its current form by a French scientist named Henry Darcy in the middle of the 19th century. It is frequently employed to establish the airspeed of aircraft,[3] the waterspeed of boats, and the flow velocity of liquids, air, and gases in industry

P0 = P2 + 12 V2z = 8.77 x 104 + 12 (1.23)(147)2 = 1.01 x 103 N/m2 p1 - P2 = w H = 1.33 x 104 N/m2 (1.33 x 105)(0.1) = 1.33 x 104 N/m2 p2 = P1 - P1 - 1.33 x 104 = 1.01 x 105

Note: As the flow in the tunnel is pulled directly from the open ambient surroundings and since an inviscid flow has no losses between the intake and the test section, it makes logical that the total pressure in the test section would equal one atmosphere.

learn more about pitot tube here:

https://brainly.com/question/14868857

#SPJ1

write a program to draw a right-justified triangle given the height as input. the first row has one asterisk (*) and increases by one for each row. each asterisk is followed by a blank space and each row ends with a newline.

Answers

Here's a program to draw a right-justified triangle with height as input:

height = int(input("Enter height of triangle: "))

for i in range(height):

   print(" "*(height-i-1) + "*"*(i+1))

In the above program, we first take the height of the triangle as input from the user. Then, we use a for loop to iterate through each row of the triangle.

In each iteration, we print a number of blank spaces to right-justify the asterisks. The number of blank spaces is equal to the difference between the height of the triangle and the current row number, minus one.

After printing the blank spaces, we print a number of asterisks equal to the current row number. Finally, we print a newline character to move to the next row.

For example, if the user enters a height of 5, the output will be:

   *

  **

 ***

****

*****

Learn more about programming:

https://brainly.com/question/26134656

#SPJ11

Which of the following expressions causes an implicit conversion between types? Assume variable x is an integer, t is a float, and name is a string.Group of answer choices7.5 + (x / 2)x + 2 * x"Hello, " + str(name)print(str(t))

Answers

x + 2 * x is the correct option. The above-selected option demonstrates implicit conversion, which is an automated type of conversion. Thus, option B is correct.

The series of conversions are necessary to change the type of a function call's argument to that of the parameter with the same name in the function declaration is known as an implicit conversion sequence. For each parameter, the compiler tries to identify an implicit conversion sequence.

If both user-defined conversion sequences A and B contain the same user-defined conversion function or constructor, and if the second standard conversion sequence of A is superior to the second standard conversion sequence of B, then user-defined conversion sequence A is preferable to user-defined conversion sequence B.

Learn more about implicit conversion here:

https://brainly.com/question/31063278

#SPJ12

build a 3-bit counter which counts in the following sequence: 0,5,2,7,4,1,6,0. when ce is high on the clock edge the current value of the counter advances to the next number in the counting sequence. so 0,5,2,7,4,1,6,0,5,2,7,4,1,6,0... is the sequence of states this counter will go through when ce is high. when ce is low the counter stays in the same state. you may use only 3 d flip-flops and logic gates. the counter's 3 output bits must come directly from the flip-flops. the counter should also have a tc output which is high at 6 (the last state before the sequence is repeated).

Answers

To create a 3-bit counter that counts in the sequence 0,5,2,7,4,1,6,0, you can use 3 D flip-flops and logic gates. The counter's 3 output bits should come directly from the flip-flops.

On the clock edge, when CE is high, the current value of the counter advances to the next number in the sequence. When CE is low, the counter stays in the same state. Additionally, the counter should have a TC output that is high at 6, which is the last state before the sequence is repeated.

To create this 3-bit counter, you would need to connect the Q outputs from the 3 flip-flops to the inputs of the logic gates. The logic gates would be responsible for generating the next state of the counter based on the current state. For example, when the current state is 0, the logic gates would generate the next state of 5.

Learn more about 3-bit counter

https://brainly.com/question/15564715

#SPJ11

Which of the following questions would be relevant to conducting a building's life-cycle assessment? (Select
all that apply.)

A. What is the cost of the building?
B. Will the building be operated by a foreign-owned corporation?
C. Will the building generate any pollution?
D. How long is the building expected to last?

Answers

The questions that would be relevant to conducting a building's life-cycle assessment? (Select all that apply.)

C. Will the building generate any pollution?

D. How long is the building expected to last?

Building's life-cycle assessment is a comprehensive evaluation of the environmental impacts of a building throughout its entire life cycle, including raw material extraction, transportation, construction, operation, maintenance, renovation, and demolition.

It aims to identify ways to reduce the building's environmental impact and promote sustainability. Relevant factors to consider in a building's life-cycle assessment may include energy efficiency, water usage, waste generation, greenhouse gas emissions, and the use of sustainable materials and practices. Additionally, the expected lifespan of the building is also a crucial factor to consider in the life-cycle assessment as it determines the overall environmental impact of the building over time.

To know more about construction visit:-

brainly.com/question/1888902

#SPJ1

How many 21 3/4" x 16 pieces can you get out of a 8'x4' piece of material

Answers

As there are 12 inches in a foot, 8 feet equals 96 inches, and 4 feet equals 48 inches. Thus, we may cut a single 8' by 4' piece of material into 12 pieces, each measuring 21 3/4" x 16".

How many square feet does a 4x8 plywood sheet measure?

A typical plywood sheet measuring 4 feet by 8 feet covers 32 square feet. If your roof is 1,600 square feet in size, you will need roughly 50 sheets to cover it if you divide 1,600 by 32.

Now that we know how many pieces of material (8'x4') measuring 21 3/4" by 16" we can get, we can :

By dividing the material's length by the length of each piece, we arrive at:

21.75 inches / 96 inches equals 4.41 (rounded to two decimal places)

By dividing the material's breadth by the width of each component, we arrive at:

48 inches / 16 inches equals 3.

As a result, we can fit 4 pieces along the material's length and 3 pieces along its width, for a total of: 4 x 3 = 12 pieces.

To know more about material visit:-

https://brainly.com/question/24002168

#SPJ1

how many 14 awg thhn conductors, including an equipment grounding conductor, can be installed in a 3/8 -in. flexible metal conduit using inside fittings?

Answers

Always refer to the NEC rules for the specific installation type and location to ensure code compliance. Hence,The correct answer is 8.

How many 14 awg THHN conductors

According to NEC Table 1, when installing a 3/8 -in. flexible metal conduit using inside fittings, the maximum number of 14 AWG THHN conductors, including an equipment grounding conductor, that can be installed is 8.

Note that this table applies only to THHN/THWN conductors with nylon coating and stranded copper. It does not take into account the quantity of neutral conductors or equipment grounding conductors that may be required for a given installation.

Learn more about metal conduit at

https://brainly.com/question/19342587

#SPJ11

assume variables (a, b, c, and max) have been declared. in this code fragment of if and nested if statements, identify the error type as syntax or logic on each indicated code line. if(a > b) {

Answers

Here is the corrected code with comments explaining the changes made to address the syntax and logic errors:

if (a > b) {

   max = a;

} else {

   max = b; // max variable is now initialized or updated properly

}

if (a < 100) {

   if (b < 100) {

       System.out.printf("a and b are both greater than 100\n"); // corrected newline character inside double quotes

   }

}

a = 1; // set a to a positive integer to avoid division by zero error

c = b / a;

if (a == b) { // use double equal signs to compare a with b

   System.out.printf("a and b are equal\n");

}

// added closing curly brace for the outer if statement

The synthesis errors in the code fragment are:

Logic error: Max variable is not initialized or updated properly if a is not greater than b.Syntax error: curly brace is not closed for the inner if statement.Syntax error: missing closing curly brace for the outer if statement.Syntax error: newline character should be inside double quotes in the printf() statement.Logic error: division by zero will occur since a has been set to 0 before the calculation.Logic error: assignment should use double equal signs to compare a with b.Syntax error: missing closing curly brace for the outer if statement.

Learn more about programming:

https://brainly.com/question/26134656

#SPJ11

Question complete:

Assume variables (a,b,c, and max) have been declared. In this code fragment of if and nested if statements, identify the error type as syntax or logic on each indicated code line.

if (a>b)

{

Max=a;//1

}

if(a<100)

{

if (b<100)

{

System.out.printf("gna and b are both greater than1008n"); // \}

}

a=0;

c=b/a;//

if (a=b)

{

 System.out.printf("ona and b are equalzn");

a=a+1;

Needle nose pliers are best used for which of the following?


Installing breakers

Tightening connectors

Shaping wires

Tightening wire nuts

Answers

Needle nose pliers are best used for option C, shaping wires. Needle nose pliers have a long, pointed and narrow tip that allows them to grip and manipulate wires in tight spaces or with precision.

What is the use of Needle nose pliers?

Needle nose pliers are a versatile tool used for gripping, bending, shaping and cutting wires, as well as for holding small objects in hard-to-reach places. They have a long, narrow and pointed tip that allows for precise handling of small parts or wires in tight spaces.

For example, they can be used by electricians to bend and shape wires, make connections or install small components in a circuit board. They are also useful for jewelry making, crafting, and other fine tasks that require precision and dexterity.

To learn more about circuit board, visit: https://brainly.com/question/30034576

#SPJ1

What are the advantages of regenerative cycle over simple Rankine cycle?

Answers

The regenerative Rankine cycle has a number of advantages over the simple Rankine cycle, such as Higher thermal efficiency, Lower exhaust, and Smaller physical size, Shorter startup time.

Higher thermal efficiency as the steam is recycled back to the boiler, resulting in higher efficiency and better fuel economy. Lower exhaust steam pressure and temperature, making it more suitable for applications with lower temperature differences between the heat source and the sink. Shorter startup time as the turbine does not require as much steam to reach operating conditions. Smaller physical size, as the high pressure and temperature equipment, is not necessary.

To learn more about  Rankine cycle :

https://brainly.com/question/17284733

#SPJ4

3–109E A 0. 083-in-diameter electrical wire at 90°F is covered by 0. 02-in-thick plastic insulation (k = 0. 075 Btu/h·ft·°F). The wire is exposed to a medium at 50°F, with a combined convection and radiation heat transfer coefficient of 2. 5 Btu/h·ft2·°F. Determine if the plastic insulation on the wire will increase or decrease heat transfer from the wire. Answer: It helps

Answers

The heat transfer rate with insulation is significantly higher than the heat transfer rate without insulation, as can be shown by comparing the two heat transfer rates.

Which has the greatest rate of heat transfer?

The table shows that solids (s) generally conduct heat at rates that are significantly higher than those of liquids (l) and gases (g).

The following equation can be used to determine the heat transfer rate without insulation under the conditions of steady-state heat transmission and little heat generation in the wire:

A = pidL A = pi0.0831 = 0.26 square inches. Q = hA(T wire - T inf).

Q = 2.50.26(90 - 50) = 26 Btu/h without insulation R = 0.02 / (0.075×0.26) = 0.98 hrft2°F/Btu

Copper, which is frequently used for electrical cables, has a thermal conductivity of roughly 223 Btu/hft°F. Inputting the values provided yields:

R total = 1 / (2230.26pi×0.0832 / 4) = 0.14 hours/feet/degrees Fahrenheit/Btu

We obtain the following by substituting the above values: q with insulation = (90 - 50) / 0.14 = 286 Btu/h

To know more about heat transfer visit:-

https://brainly.com/question/30772526

#SPJ1

Determine the magnitude of fb. Express your answer to three significant figures and include the appropriate units. Activate to select the appropriates template from the following choices. Operate up and down arrow for selection and press enter to choose the input value typeactivate to select the appropriates symbol from the following choices. Operate up and down arrow for selection and press enter to choose the input value type fb

Answers

The magnitude of FB is 700 N, and its orientation is 59.5° from the x-axis.

Since the resultant force is directed along the positive y-axis, we know that the y-component of FB must be equal and opposite to the y-component of Fa, which is 700 N * sin(30°) = 350 N. Therefore, the magnitude of the y-component of FB is also 350 N.

To find the magnitude of FB itself, we can use the Pythagorean theorem:

[tex]FB^2 = (y-component of FB)^2 + (x-component of FB)^2[/tex]

[tex]FB^2 = (350 N)^2 + (FBx)^2[/tex]

We do not have enough information to directly solve for FBx, but we can use the fact that the angle between FB and the x-axis is the complement of the angle between Fa and the x-axis (since the two forces are perpendicular). Therefore,

tan(θ) = FBx / 350 N

where θ is the angle between FB and the x-axis.

We also know that the magnitude of FB is equal to the magnitude of Fa, which is 700 N. Therefore, we have:

[tex]FB^2 = FBx^2 + (350 N)^2 = (700 N)^2[/tex]

Solving for FBx, we get:

[tex]FBx = sqrt((700 N)^2 - (350 N)^2) = 606 N[/tex]

Using the equation for tan(θ), we get:

θ = arctan(FBx / 350 N) = 59.5°

Therefore, the magnitude of FB is 700 N, and its orientation is 59.5° from the x-axis.

Learn more about Pythagorean theorem here https://brainly.com/question/14930619

#SPJ4

state which parties will be responsible for the following task in a construction of an earthfall dam for irrigation:
1.Providing labour.
2.Funding the construction of the dam. 3. Approving the drawings
4.Overall coordination of the project.
5.Setting up coordinates and levels for back-filling​

Answers

The parties in the construction of an earthfall dam for irrigation who will be responsible for the following services are given below.

What is the justification for the above response?

Providing labor: The responsibility for providing labor in the construction of an earthfill dam for irrigation will typically fall on the contractor or construction company that has been awarded the contract for the project. The contractor is usually responsible for hiring and managing all the necessary labor, including skilled and unskilled workers, to complete the construction of the dam.

Funding the construction of the dam: The responsibility for funding the construction of the earthfill dam will usually lie with the party or parties that have commissioned the project. In most cases, this will be a government agency or a private company that is investing in the construction of the dam.

Approving the drawings: The responsibility for approving the drawings for the earthfill dam will typically fall on the government agency or private company that is commissioning the project. The drawings will need to be approved by the relevant regulatory bodies and local authorities to ensure that the dam meets all the necessary safety and environmental standards.

Overall coordination of the project: The responsibility for the overall coordination of the project will usually fall on the project manager or project team that has been appointed by the commissioning party. The project manager will be responsible for overseeing all aspects of the project, including managing the budget, scheduling, and ensuring that the construction work is completed to the required standards.

Setting up coordinates and levels for back-filling: The responsibility for setting up the coordinates and levels for back-filling will typically fall on the engineering team that is responsible for the design and construction of the dam. The engineering team will be responsible for surveying the site and determining the best locations for the dam, as well as setting the appropriate coordinates and levels for the back-filling process.

Learn more about construction  at:

https://brainly.com/question/25795065

#SPJ1

Answer:

project manager

Explanation:

During a drought, the water table____

Answers

During a drought, the water table typically drops due to reduced precipitation and increased evaporation.

What is the Water Table?

The water table is the underground layer of soil or rock that is saturated with water, and it fluctuates based on various factors such as rainfall, surface water levels, and human activities such as groundwater pumping.

Drought conditions reduce the amount of water available to replenish the water table, which can lead to a depletion of groundwater resources.

This can have negative impacts on ecosystems, agriculture, and human communities that rely on groundwater for drinking water and other uses.

Read more about droughts here:

https://brainly.com/question/12686086

#SPJ1

Conduit pip benders are best used with which of the following materials?


THHN wire

Non-metallic sheathed cable

Electrical metallic tubing

Rigid conduit

Answers

Conduit pipe benders are best used with electrical metallic tubing (EMT) and rigid conduit.

Why conduit pipe benders are best used with EMT and rigid conduit only?

These types of conduits are made of metal and require bending to fit around corners and obstacles in electrical installations.

THHN wire and non-metallic sheathed cable, on the other hand, are not typically bent using conduit pipe benders. THHN wire is typically run through conduit, but the conduit itself would be bent, not the wire. Non-metallic sheathed cable, also known as Romex, does not require conduit and is not typically bent during installation.

To learn more about rigid conduit, visit: https://brainly.com/question/30772913

#SPJ1

The best place to adjust speed to steer through a curve is

Answers

The best place to adjust speed to steer through a curve is at the beginning of the curve.

This is because when entering the curve, it is important to be travelling at a speed that is appropriate for the radius of the curve. Entering the curve at a slower speed will give you more control over the vehicle and allow you to navigate the curve safely.

Speed should be gradually reduced before entering a curve, and the driver should maintain a steady speed throughout the curve. Braking while turning can be dangerous, as it can cause the vehicle to skid or lose control. It is also important to ensure that the vehicle is in the correct gear for the speed and road conditions.

To learn more about Speed :

https://brainly.com/question/21729272

#SPJ4

The torque wrench ABC is used to measure the moment or torque applied to a bolt when the bolt is located at A and a force is applied to the handle at C. The mechanic reads the torque on the scale at B. If an extension AO of length d is used on the wrench, determine the required scale reading if the desired torque on the bolt at O is to be M

Answers

The required scale reading TB is: TB = M * (1 + cos θ) / (cos θ * (d + r))

To solve this problem, we can apply the principle of moments, which states that the sum of all moments acting on a body must be zero in order for the body to be in equilibrium.

We start by drawing a free-body diagram of the wrench and the bolt, as shown below:

         M (torque on bolt at O)

           ↑

           |

           |

   C ===== B ===== A

           |

           |

         F (force on handle)

where F is the force applied to the handle at C, M is the desired torque on the bolt at O, and d is the length of the extension AO.

Let T be the tension in the wrench, and let r be the distance between the bolt at A and the point of application of the tension T. We can then write the equation for the torque at point A as:

TA = Tr = F * d + TB

where TB is the torque measured by the scale at B.

Since the wrench is in equilibrium, the sum of all forces and moments acting on the wrench must be zero. We can write:

∑F = 0

∑M = 0

In the x-direction, we have:

F - T = 0

Therefore, T = F.

In the y-direction, we have:

TB cos θ - M = 0

where θ is the angle between the extension AO and the handle BC.

Solving for TB, we obtain:

TB = M / cos θ

Substituting TB in the equation for TA, we obtain:

TA = F * d + M / cos θ

Finally, we can solve for the required scale reading TB by equating TA to the torque on the bolt at O:

M = F * (d + r) + TB

Substituting TB = M / cos θ, we obtain:

M = F * (d + r) + M / cos θ

Solving for TB, we obtain:

TB = M * (1 + cos θ) / (cos θ * (d + r))

Therefore, the required scale reading TB is:

TB = M * (1 + cos θ) / (cos θ * (d + r))

Learn more about principle of moments here https://brainly.com/question/26117248

#SPJ4

A ___________ is defined as a change in shape of the part between the damaged and undamaged area hat is smooth and continuous. When the part is straightened, it is returned to proper shape and state without any areas of permanent deformation

Answers

A plastic deformation is defined as a change in shape of the part between the damaged and undamaged area that is smooth and continuous. When the part is straightened, it is returned to its proper shape and state without any areas of permanent deformation.

Plastic deformation is considered as a crucial concept in mechanical engineering and materials science because it influences material qualities such as the strength and durability. It is also crucial in manufacturing operations since it influences the quality of the items produced.

Plastic deformation may occur as a result of a number of operations, including bending, stretching, pressing, and forging.

For more such questions on deformation, click on:

https://brainly.com/question/63369

#SPJ11

(1) Under the free-space path-loss model, find the transmit power required to obtain a received power of 1 dBm for a wireless system with isotropic antennas (Gl = 1) and a carrier frequency f = 5 GHz, assuming a distance d = 10 m. Repeat for d = 100 m

Answers

Under the free-space path-loss model, the transmit power required is -91.99 dBm for a distance of 10 m and the transmit power required is -71.99 dBm for a distance of 100 m.

The free-space path-loss model describes how the power of a radio signal decreases as it propagates through space. It is given by:

Pr = Pt × Gt × Gr × (c / 4πdf)²

where:

Pr is the watts of received power (W)

Pt is the transmit power in W

Gt and Gr are the gains of the transmitting and receiving antennas, respectively

c is the speed of light in meters per second (m/s)

f is the carrier frequency in hertz (Hz)

d is the distance between the antennas in meters (m)

Gt = Gr = 1 for an isotropic antenna.

To find the transmit power required to obtain a received power of 1 dBm = 0.001 W for a wireless system with isotropic antennas and a carrier frequency f = 5 GHz:

For d = 10 m:

By entering the specified values into the formula, we obtain:

0.001 W

= Pt × 1 × 1 × (3x10⁸ m/s / 4π × 5x10⁹Hz × 10 m)²

Simplifying and solving for Pt, we get:

Pt = 6.31 x 10⁻¹¹ W

= -91.99 dBm

Therefore, the transmit power required is -91.99 dBm for a distance of 10 m.

For d = 100 m:

By entering the specified values into the formula, we obtain:

0.001 W

= Pt × 1 × 1 × (3x10⁸ m/s / 4π x 5x10⁹ Hz x 100 m)²

Simplifying and solving for Pt, we get:

Pt = 6.31 x 10⁻⁸ W

= -71.99 dBm

Therefore, the transmit power required is -71.99 dBm for a distance of 100 m.

To learn more about free-space path-loss model click here

brainly.com/question/30609549

#SPJ4

There are three car manufacturing factories A,B and C and they are producing the same type of cars.they are employing 1000,2000, and 3000 men and producing 10,15, and 25 cars per month respectively.find the labour productivity of each form and the production of each form per year

Answers

Answer:

  A: 0.010 cars/man·month, 120 cars/year

  B: 0.0075 cars/man·month, 180 cars/year

  C: 0.0083 cars/man·month, 300 cars/year

Explanation:

You have factories A, B, C employing 1000, 2000, 3000 men and producing 10, 15, 25 cars per month. You want to know the productivity and annual production of each factory.

Productivity

Productivity is output per input. In this case, the input is measured in man·months. The output is measured in cars.

  A: 10 cars/(1000 man·months) = 0.010 cars/man·month

  B: 15 cars/(2000 man·months) = 0.0075 cars/man·month

  C: 25 cars/(3000 man·months) ≈ 0.0083 cars/man·month

Production

The annual production rate is 12 times the monthly production rate, assuming each factory works 12 months per year.

  A: 10 cars/mo · 12 mo/yr = 120 cars/yr

  B: 15 cars/mo · 12 mo/yr = 180 cars/yr

  C: 25 cars/mo · 12 mo/yr = 300 cars/yr

a flow meter attached to the main line in a hydraulic system measures the flow rate at 10 gpm. the line has an inside diameter of 2 in. what is the flow velocity in the meter?

Answers

The flow velocity in the meter is 0.7958 in/min

How to determine

The flow meter attached to the main line in a hydraulic system measures the flow rate at 10 gpm. The line has an inside diameter of 2 in.

The flow velocity in the meter can be calculated using the formula:

Velocity = (Flow rate) / (Cross-sectional area)

The cross-sectional area of the line can be calculated as:

Area = π × (diameter/2)²

Substituting the given values, we get:

Area = π × (2/2)²

Area = π × 1

Area = π

Therefore, the velocity in the meter is:

Velocity = (10 gpm) / (π in²)

Simplifying the units, we get:

Velocity = (10 gal/min) / (π × (2 in)²)

Velocity = (10 gal/min) / (π × 4 in²)

Velocity = (10/4π) in/min

Velocity ≈ 0.7958 in/min

Learn more about velocity at

https://brainly.com/question/17127206

#SPJ11

Which of the following is the safest type of ladder to use when working around electrical circuits?

Fiberglass step ladder

Aluminum step ladder

Extension ladder

Folding ladder

Answers

Answer:

Fiberglass step ladder

Explanation:

When you are working around electricity, always choose non- conductive tools. Aluminum ladder, extension ladder, and folding ladders are all conductors for electricity. Fiberglass is not a conductor for electricity, therefore the safest ladder would be to use the fiberglass step ladder.

Hope this helps :)

Other Questions
if a force of 50 newton stretches a wire from 20m to 20.01m what is the amount of force required to stretch the same material from 20m to 20.05m The triangles below are similar. Calculate the length of the unknown sides. What types of tectonic forces create mountains? Northern Illinois Manufacturing provides products and services needed to irrigate farms, parks, commercial properties, and private homes. It has a centrally located factory that manufactures the products it markets to retail outlets across the nation. The month of November has just ended and Northern Illinois needs to generate a cost of goods manufactured and cost of goods sold for its income statement. The application of overhead is based on direct labor hours. At the beginning of the year, the company estimated direct labor hours of 40,000 and total estimated overhead of $2,000,000. During the month of November, the number of direct labor hours was 3,275. The following additional data for November is provided:Indirect Materials in Manufacturing Overhead$ 17,500Advertising Expense 54,000 Depreciation Factory Equipment 16,800 Depreciation Office Equipment 2,400 Direct Labor 82,000 Factory Supplies 10,800 Factory Utilities 10,200 Finished Goods Inventory November 30 68,800 Finished Goods Inventory October 31 72,550 Indirect Labor 48,000 Office Supplies Expense 1,600 Other Administrative Expenses 72,000 Raw Materials Inventory November 30 52,700 Raw Materials Inventory October 31 38,000 Raw Materials Purchases 184,500 Rent Factory Equipment 47,000 Repairs Factory Equipment 4,500 Salaries 325,000 Sales 1,350,000 Sales Commissions 40,500 Work In Process Inventory November 30 52,700 Work In Process Inventory October 31 42,000 Property Tax on Factory 5,500Instructions: From the above information, prepare a cost of goods manufactured schedule, cost of goods sold schedule, and an income statement to the net operating income. 85 cm with area base of 245cm can yall help me with this i cant even solve this with a calculator The graph shows the responses of 120 students who were asked whether they spend too much or too little time watchingtelevision.Television ViewingToo little 30%Aboutright 5%Too much 20%Don't know 45%How many thought they watched too much television?a.6 studentsb. 24 studentsc. 28studentsd. 36 students ssume that the economy can experience four possible states: high growth, normal growth, recession, or depression. For each of those states, you expect the following stock market returns for the coming year:State of the Economy Probability ReturnHigh Growth 0.2 35%Normal Growth 0.6 15%Recession 0.15 -10%Depression 0.05 -15%In dollar terms, what is the value at risk (over a one-year horizon at a 5 percent probability) associated with a $1,000 investment?The value at risk: $____ The site that you named in question 1. 5 can be classified as a primary attraction. By refering to the distance table in Annexure B,describe Two other activities that are also available for tourists as secondary attractions Imagine that youre studying the relationship between newborns weight and length. You have the weights and lengths of the 10 babies born last month at your local hospital. Calculate the r for this sample. maintaining competitive and equitable salaries and benefits among the various operations of the organization is one component involved in managing the problem of . I. Sabine PassII. Palmito RanchIII. Red River campaignIV. GalvestonWhat is the correct sequence for the above battles in the Civil War? Show that the number is a zero of f(x) of the given multiplicity, and express f(x) as a product of linear factors.f(x) = x^6 12x^5 + 45x^4 405x^2 + 972x 729; 3 (mult. 5) Which of the following questions would be relevant to conducting a building's life-cycle assessment? (Selectall that apply.)A. What is the cost of the building?B. Will the building be operated by a foreign-owned corporation?C. Will the building generate any pollution?D. How long is the building expected to last? Completely factor the expression below. 4x^ 2 + 14x + 10 # 16 iYou are given that ZYZW and ZZYX are right angles. What additional piece of information allows you to prove that AWYZAXZY?WNOYZ ZYO WY XZO WZ|XYO ZYLXYPrevious11 1213141516 17 18 19 20Next what is a nonrenewable resource ?A- natural resource that is replaceableB- natural resource that is limited in supply C- existing materials that are captured through using the heat of earthD- alternative energy forms like solar energy and wind power that can be recycled A. DIRECTIONS: Underline each noun phrase in these examples from "The FourFreedoms. " Some sentences will have more than one noun phrase. If there is a nounphrase within a noun phrase, make the shorter one bold. |1. Armed defense of democratic existence is now being gallantly waged infour continents. 2. We need not overemphasize imperfections in the Peace of Versailles. 3. No one can tell the exact character of the emergency situations that we maybe called upon to meet. 4. Just as our national policy is this. 5. A free nation has the right to expect full cooperation from all groups. CAN SOMEONE HELP WITH THIS QUESTION? Describe the problems that the Democratic Republic of the Congo struggled with after gaining independence.PLEASE HURRY DUE RIGHT NOW